No Road Construction Delays for Memorial Day Travelers

May 23, 2023 at 04:12 pm by WGNS News


You'll have one less worry on state roadways this upcoming Memorial Day Weekend in the Volunteer State because all road construction projects will be halted. The Tennessee Department of Transportation (TDOT) will suspend all construction-related lane closures on interstates and state routes beginning at noon on Friday, May 26 through 6:00 a.m. on Tuesday, May 30. This will provide maximum roadway capacity for motorists expected to travel in the state this Memorial Day weekend.

"Suspending construction-related lane closures during the Memorial Day weekend will lessen congestion and delays on Tennessee's major highways," said Commissioner Butch Eley. "We want to do our part to help everyone have an enjoyable and safe holiday weekend and keep traffic flowing as smoothly and efficiently as possible."

Motorists may still encounter some lane closures or restrictions while traveling through long-term construction projects. In addition, drivers should know that reduced speed limits will be in effect in work zones. Drivers convicted of speeding through work zones where workers are present face a fine of up to $500, plus court fees and possible increased insurance premiums.

AAA predicts 751,000 Tennesseans will hit the road for Memorial Day weekend. That’s 40,500 more than last year during the long holiday travel period.

From your desktop or mobile device, get the latest construction activity and live streaming SmartWay traffic cameras at www.TNSmartWay.com/Traffic. Travelers can also call 511 for travel information. As always, drivers are reminded to use all motorist information tools wisely and Know Before You Go! by checking travel conditions before leaving for their destination. Drivers should never tweet, text, or talk on a cell phone while behind the wheel.


 

Tags: construction I-24 I-65 I-840 LaVergne Memorial Day Murfreesboro Nashville No Road Construction Rutherford County Smyrna TDOT Tennessee TN Travelers
Sections: News