Winter's Back--Ram Has Road Report!

Nov 18, 2023 at 10:47 am by WGNS


(MURFREESBORO) Old man winter is back, especially when it gets dark, and that impacts traffic in construction zones. Murfreesboro Transportation’s Deputy Director Ram Balachandran warns motorists of areas to avoid between today and Nov. 25, 2023.

City Construction Projects

              

Beasie Rd Extension (River Rock Blvd just north of Racquet Club Dr) 

Expected Lane Closures:   Monday Through Wednesday:  Riverrock Blvd will be reduced to one-lane flagging operation at Beasie Rd for waterline installation work.  Road and bridge construction work over Stones River Greenway continues.  The greenway trail will be closed around the existing Beasie Rd area until further notice due to bridge construction work over the greenway trail.  There will be no through trail access between the Old Fort Park and Cason Trailhead.  Appropriate traffic controls will be in place. 

 

Elam Rd Re-Alignment Project (Joe B Jackson Pkwy just east of I-24 Interchange)

Expected No Road Closures:   Monday through Wednesday:  Contractor for a private development will be doing new road construction work along Elam Rd and Joe B Jackson Pkwy.  There will be no street closures.  There will be minor traffic interruptions from construction vehicles entering and exiting along Elam Rd and Joe B Jackson Pkwy.  Appropriate traffic controls and will be in place.

 

Ramp Improvement, Lighting and Signalization Project (I-840 and Veterans Pkwy Interchange)

Expected Lane Closures:   Monday through Wednesday:  Incidental traffic signal and pavement marking work continues.  There will be minor traffic interruptions.  Appropriate traffic controls and will be in place.

 

Right Turn Lane Installation Work (Greshampark Dr near Wilkinson Pike)

Expected Lane Closures:  Monday through Wednesday:  Contractor for a private development will be installing a right turn lane on Greshampark Dr near Wilkinson Pike.  There lane closures and traffic shifts on Greshampark Dr.  Appropriate traffic controls will be in place.

 

Annual City Street Paving

 

Expected Lane Closures:  Monday through Wednesday, 9:00 AM – 3:00 PM:  City contractor will be performing construction work at the following streets:

  1. Medical Center Pkwy EB between I-24 and Thompson Ln (roadway and traffic signal improvements)
  2. McKnight Park Rd extension off Lt. Patrick McBride Dr ( roadway construction work)
  3. Palmer Dr and Boston St (Palmer Dr to MTB) and Leaf Ave (milling work)
  4. Cason Trl and Saint Andrews Dr (pavement marking work)

Expect lane shifts and traffic interruptions.  Appropriate traffic controls will be in place.

 

TDOT Resurfacing Projects

 

RUTHERFORD COUNTY I-840

The resurfacing of I-840 from the West Fork Stones River Bridge to near Exit 61

 

RUTHERFORD COUNTY SR 96

The resurfacing on SR-96 from Compton Road (16.73) to Cainsville Pike (20.50)

 

RUTHERFORD COUNTY SR 99

The grading, drainage, construction of retaining walls, signals and paving on SR-99 (New Salem Hwy) from near I-24 to SR-96 (Old Fort Pkwy)

 

RUTHERFORD COUNTY SR 266

The grading, drainage, construction of two concrete bulb tee beam bridges, signals, and paving on SR-266 (Jefferson Pike) from SR-102 (LM 5.0) to E. of I-840 (LM 9).

 

(Source: TDOT)

Tags: construction areas Deputy Director Murfreesboro Transportation Department Ram Balachandran WGNS
Sections: News