Weather Changes Bring Traffic Changes

Aug 29, 2020 at 09:34 am by WGNS


(MURFREESBORO)  Changes in the weather bring changes in traffic challenges. Murfreesboro Transportation Department's Deputy Director Ram Balachandran offers his weekly traffic report. It is good for today through September 5, 2020.

City Construction Projects 

Right Turn Lane Improvement Work (Robert Rose Dr at Thompson Ln)

ADVERTISEMENT

Expected Lane Closures:  Monday through Friday, 9:00 am to 3:00 pm:  Contractor for the City of Murfreesboro will be making right turn lane improvements on Robert Rose Dr at Thompson Ln.  Appropriate traffic controls will be in place.

 

Underground Utility Installation Work (Sulphur Springs Rd at Northfield Blvd)

Expected Lane Closures:  Monday through Friday, 8:30 am to 4:00 pm:  Contractor for a private development will be performing underground utility work on Sulphur Spring Rd.  Appropriate traffic controls will be in place. 

 

Traffic Signal Installation Work

  1. Memorial Blvd & Kings Ridge Dr
  2. Memorial Blvd and Eleanor Dr

Expected Lane Closures:  Monday through Friday: 8:30 am to 3:30 pm:  City Traffic Signal contractor will be installing traffic signal loops on Memorial Blvd and the downtown area.  There will be lane closures and traffic interruptions.  Appropriate traffic controls will be in place. 

 

Roadway Widening and Turn Lane Improvement Work (Florence Rd at Pointer Pl)

Expected Lane Closures:  Monday through Friday, 8:30 am to 3:30 pm:  Contractor for a private development (Shelton Crossing) will be performing roadway widening and turn lane installation work at Florence Rd and Pointer Pl.  There will be minor lane closures and traffic interruptions.  Appropriate traffic controls will be in place.

 

Annual City Street Paving Projects

Expected Lane Closures:  Monday through Friday, 9:00 AM – 3:00 PM:  City contractor will be performing construction work at the following streets:

  1. St Ives Dr (drainage Work)
  2. Medical Center Pkwy between GreshamPark Dr and Robert Rose Dr (crosswalk markings)
  3. Arrow Ct, Glenwood Dr, Lawndale Dr, Bradyville Pike & Fox Creek Dr  and Rucker Ln bet Swanholme Dr and Old Salem Rd (Paving work)
  4. Riverbend Dr bet Thompson Ln and Londonberry Dr (castings adjustments)

Expect lane shifts and traffic interruptions.  Appropriate traffic controls will be in place.

 

TDOT Resurfacing Projects

RUTHERFORD COUNTY, I-24 SMART Corridor

  • Nightly, 8PM-5AM, There will be intermittent lane closure between MM 55-80 for barrier rail relocation.

RUTHERFORD COUNTY, The construction of pedestrian facilities on SR 10 Memorial Blvd from DeJarnette Ln to Thompson Ln in Murfreesboro

  • Daily, 8:00AM-3:30PM, There will be a right lane closure in both direction to excavate and install sidewalk. One to two lanes will remain open at all times.
  • Nightly, 8:00PM-5:00AM, There will be alternating lane closures at DeJarnette Ln for curb ramp island construction.

RUTHERFORD COUNTY, SR 99 (New Salem Hwy) resurfacing from Cason Lane to I-24

  • Daily, 9AM-4PM, There will be intermittent lane closure in both directions between the intersection of Warrior Dr and the intersection of Cason Ln on SR 99 for utility and construction work.  One lane will remain open at all times.
  • Monday, August 17 through Monday, August 31, Barfield Road will be closed at SR 99 for reconstruction. A signed detour will be in place.

RUTHERFORD COUNTY, Overhead Sign Replacement on I-24

  • Nightly, 8PM-5AM, There will be alternating lane closures in both direction at MM 63-64 to place overhead sign.

 

Source: TDOT

Sections: News