(MURFREESBORO) Mornings are starting to have the feel and scent of fall. Transportation Department Deputy Director Ram Balachandran checks area construction jobs and warns of areas to avoid today through September 17, 2022.
City Construction Projects
Oakland Court Development (Lokey Ave and Academy St)
Expected Road Closures: Monday through Friday: As part of the Oakland Court development, Academy St will be closed to through traffic between Palm Ct and Hembree St. Lokey Ave will also be closed at Academy St. Site construction work continues. Appropriate traffic controls and detours will be in place.
Brinkley Rd Improvement Project (between Blaze Dr and Timber Creek Dr)
Expected Lane Closures: Monday through Friday: As part of bridge construction work, there will be minor traffic interruptions on Brinkley Rd between Blaze Dr and Timber Creek Dr. Bridge work continues on Brinkley Rd just to the south of Timber Creek Dr. Appropriate traffic controls are be in place.
Medical Center Pkwy Turn Lane and Signal Improvement (between Maplegrove Dr and Willowoak Dr)
Expected Lane Closures: Monday through Friday, 8:30 am to 3:30 pm: As part of private development, right turn lanes and traffic signal improvements will be made along the north side of Medical Center Pkwy between Maplegrove Dr and Willowoak Dr. Westbound traffic on Medical Center Pkwy will be reduced to one lane. Eastbound traffic will not be affected. Appropriate traffic controls will be in place.
Nighttime Overhead Electrical Line Work (Veterans Pkwy just south of Blackman Rd)
Expected Lane Closures: Friday, September 9, 10:00 pm to 3:00 am: Middle Tennessee Electric crews will be installing overhead electrical lines on Veterans Pkwy just south of Blackman Rd. Northbound traffic (going towards I-840) will be shifted onto the continuous center turn lane. Appropriate traffic controls including arrow boards for the lane shift will be in place.
Turn Lane Improvement Work (SR 96 at Veterans Pkwy)
Expected Lane Closures: Monday through Friday, 8:30 am to 3:30 pm: As part of private development, construction crews will be working along the SE quadrant of SR 96 and Veterans Pkwy. There will be lane closures and traffic interruptions. Appropriate traffic controls will be in place.
Turn Lane & Traffic signal Improvement Work (Chaffin Pl and Old Fort Pkwy)
Expected Lane Closures: Monday through Friday, 8:00 am to 4:00 pm: Construction crews will be working along Chaffin Pl at Old Fort Pkwy. There will be lane closures and traffic interruptions. On Tuesday between 11:00 pm and 5:00 am there will be lane closures and traffic signal interruptions at Old Fort and Chaffin Pl. Appropriate traffic controls will be in place
Annual City Street Paving
Expected Lane Closures: Monday through Friday, 9:00 AM – 3:00 PM: City contractor will be performing construction work at the following streets:
- Bell St between Crestland Ave and Hale Ave (culvert replacement work)
- Kings Ridge Dr (school zone light installation work)
- Bear Branch Cove, Caroline Farms Subdivision Section 1&2 and Mall Circle Dr (paving work)
- Mall Circle Dr (milling & paving work)
- Osborne Ln & Florence Rd (sidewalk repair work)
- Rutherford Blvd between Broad St and S Church St (milling and striping work)
Expect lane shifts and traffic interruptions. Appropriate traffic controls will be in place.
TDOT Resurfacing Projects
RUTHERFORD COUNTY, I-24
The resurfacing on I-24 from near Baker Road to east of Medical Center Pkwy. MM 70 - 80
- Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures EB and WB for milling operations. Three lanes will remain open at all times.
RUTHERFORD SR 99
The grading, drainage, construction of retaining walls, signals and paving on SR-99 (New Salem Hwy) from near I-24 to SR-96 (Old Fort Pkwy)
- Daily, 9 a.m. – 3 p.m., There will be periodic flagging operations for construction activities.
RUTHERFORD COUNTY SR 10 / US 231
The resurfacing of SR10 (US 231) from SR269 (L.M. 4.29) to North of Volunteer Road (L.M. 8.63)
- Daily, 8:30 a.m. – 2 p.m. & 3:30 p.m. – 6 p.m., There will be lane closures both NB and SB for milling and paving operations. One lane to remain open at all times.
RUTHERFORD/WILSON COUNTY SR 452
The resurfacing of SR-452 from I-840 to SR-10
- Daily, 7 a.m. – 6 p.m., There will be alternating lane closures for paving operations. One lane will remain open in each direction.
(Source: TDOT)